💨 Abstract

Tata Power has received approval to install a 100-MW battery energy storage system (BESS) project in Mumbai over the next two years. The system, equipped with advanced black start functionality, will ensure swift recovery of power supply to critical infrastructure in case of grid disturbances, and optimize reactive power management.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io