💨 Abstract

Assam CM Himanta Biswa Sarma announced a revised cost of Rs 1,019.17 crore for the Jorhat-Majuli bridge over the Brahmaputra, an increase of nearly Rs 94 crore. The construction work was stalled in September 2021 due to the contractor leaving the site.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io