💨 Abstract

In Mumbai, BEST undertaking proposes to rationalize 32 bus routes in 2025 to improve last-mile connectivity with the upcoming launch of the second phase of the Mumbai Metro 3 Line. The plan involves augmentation, diversion, extension, and curtailment of various routes, reducing wait times by up to 15 minutes.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io