💨 Abstract

The Bangalore Metro Rail Corporation (BMRCL) has successfully completed the erection of four composite steel girders over a 65-meter-long railway track at Rainbow Hospital, accommodating existing and future railway lines and K-Ride. This was done despite challenging conditions, including a skew road and limited space, using a single 700 MT crane instead of two due to the restricted operational capacity.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io