💨 Abstract
The Bangalore Metro Rail Corporation (BMRCL) has successfully completed the erection of four composite steel girders over a 65-meter-long railway track at Rainbow Hospital, accommodating existing and future railway lines and K-Ride. This was done despite challenging conditions, including a skew road and limited space, using a single 700 MT crane instead of two due to the restricted operational capacity.
Courtesy: theprint.in
Summarized by Einstein Beta 🤖
Suggested
"There are so many special feelings..": Prajakta Koli attends Jaipur Literature Festival 2025
Trump tariffs on Canada, Mexico and China begin Saturday: White House
Analysis-Why the US is claiming China’s presence violates the Panama neutrality treaty
Clear-cut political speech, no acknowledgment of citizens' issues: Congress on president's address
Meta in talks to reincorporate in Texas or another state, exit Delaware, WSJ reports
Either Dube has become fast or Rana a batter: Sarcastic Buttler on concussion sub
Never talks about people's issues, spreads conspiracy theories: Congress hits back at PM Modi
UP CM Adityanath conducts aerial survey of Ayodhya amid surge in devotees
UP: Driver crashes car through toll plaza barrier, drags employee on bonnet for 1 km
Soccer-Al-Nassr sign Colombia forward Duran from Aston Villa
Powered by MessengerX.io