💨 Abstract

The Union Cabinet has approved the construction of three corridors under Chennai Metro Rail Project phase-II, totaling 118.9 km with 128 stations. The project, costing Rs 63,246 crore, includes corridors such as Madhavaram to SIPCOT (45.8 km, 50 stations), Lighthouse to Poonamalle Bypass (26.1

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io