💨 Abstract

The Delhi Jal Board has initiated a project to increase the storage capacity of the Wazirabad pond area in Delhi by desilting the pond, which is expected to boost water production by 100 million gallons per day. The desilting work, estimated to cost Rs 25 crore, aims to remove 3.63 lakh cubic metres of silt from the pond.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io