💨 Abstract

The second round of trial incineration of Union Carbide waste from the 1984 industrial disaster site in Bhopal concluded on March 8 in Madhya Pradesh's Dhar district. A total of 10 tonnes of waste was incinerated in 79 hours, with all emission levels reportedly within permissible limits.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io