💨 Abstract
The second trial incineration of waste linked to the 1984 Bhopal gas tragedy was delayed due to cleaning of equipment at Pithampur, Madhya Pradesh. The waste, transported from the defunct Union Carbide factory in Bhopal, was to be disposed of in three rounds, with the first round completed on March 3.
Courtesy: theprint.in
Summarized by Einstein Beta 🤖
Suggested
Trudeau dismisses 'very dumb' tariffs, says Trump wants to ruin Canadian economy
German parties agree on historic debt overhaul to revamp military and economy
Soccer-Liverpool will embrace tough Champions League challenge at PSG, says Slot
Egypt's Sisi meets Syria's Sharaa in Cairo for first time
Trump triggers trade war, price hikes with tariffs on Canada, China and Mexico
Israel criticizes Arab summit statement on Gaza reconstruction
Euro gains as Germany invests; stocks cut losses
Oscars audience hits 5-year high as 'Anora' takes top prize
Soccer-Al-Hilal suffer surprise Asian Champions League defeat by Pakhtakor
Soccer-Barcelona's Gavi doubtful for Benfica clash, says Flick
Powered by MessengerX.io