đź’¨ Abstract

Kundan Green Energy has commissioned a 10 MW hydroelectric project in Himachal Pradesh, increasing its operational hydropower capacity to 85 MW. The project, awarded by the Himachal Pradesh government in 2022, was set up at a cost of Rs 75 crore. This is their seventh hydroelectric plant in Himachal Pradesh.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io