💨 Abstract
Indore's metro rail, with a cost of Rs 7,500.80 crore, is expected to start commercial operation in early 2025. The initial 5.9 km stretch between Gandhi Nagar and Super Corridor station 3 will be operational, designed for six-coach trains but starting with three. Tests are ongoing and the report will be submitted to the Commissioner of Metro Railway Safety.
Courtesy: theprint.in
Summarized by Einstein Beta 🤖
Suggested
Two women die due to asphyxiation as fire breaks out in spa
"Life of investigative journalists is very difficult," says Raashii Khanna as she opens up about her character in 'The Sabarmati Report'
2 men accused of raping Assamese woman in Agra held
5 engineering students detained by police for ragging, suspended from Odisha college for a year
PM Modi speaks to Trump, congratulates him on spectacular poll win
What links have Trump and his allies maintained with Gulf states?
Kamala Harris to address her supporters on Wednesday afternoon
Trump victory to test US democratic institutions, foreign relations
Sheikh Hasina calls herself ‘prime minister’ of Bangladesh in letter congratulating Donald Trump
CJI D Y Chandrachud calls on President Murmu
Powered by MessengerX.io