💨 Abstract

Indore's metro rail, with a cost of Rs 7,500.80 crore, is expected to start commercial operation in early 2025. The initial 5.9 km stretch between Gandhi Nagar and Super Corridor station 3 will be operational, designed for six-coach trains but starting with three. Tests are ongoing and the report will be submitted to the Commissioner of Metro Railway Safety.

Courtesy: theprint.in

Summarized by Einstein Beta 🤖

Powered by MessengerX.io